Orlando County Sheriff

PROBLEM: Large cracks in concrete substrate
SOLUTION: Application of Arisfor ToughDeck for concrete repair

Overview
The loading dock at the Orange County Sheriff’s Office was in need of restoration because of the large cracks in the concrete substrate. Due to frequent deliveries, the repair work needed to be completed quickly. Traditional repair methods had not been successful in the past because of heavy forklift traffic. Arisfor ToughDeck was used on this site to fill and completely cover the existing cracks. Now, despite the heavy forklift traffic, this ToughDeck surface shows no signs of cracking or wear.

Advantages
• Within two hours of completion, the loading dock was back in service
• The concrete slab looks as good as new after the repair
• This unique coating is abrasion resistant and impact resistant
• Tough Deck provides a long lasting non-slip surface in any temperature or climate
Easy application and dries to the touch within 2-4 hours
• Is moisture permeable and protects against water intrusion
• Long term savings 

Download PDF

Location: Orlando, FL

Application
Trowel

Browse Images

View More Project Examples