FORTA Plant Loading Dock Entrance

PROBLEM: Cracked and worn down concrete
SOLUTION: Application of Arisfor ToughDeck

Overview
Our plant loading dock entrance was cracked and the top layer of concrete was worn down, exposing the aggregate. The substrate was acid washed and pressure washed in the morning, then our product was applied a few hours later. The first coat was applied to cover the mesh, while the second coat was applied to cover the project completely. Due to the quick dry time of our product, we were able to walk on the dock entrance within hours of application.

Advantages
• This project was completed in one day and back in service the next day
• The concrete looks as good as new after the repair
• This unique coating is abrasion resistant and impact resistant
• Provides a long lasting non-slip surface in any temperature or climate
Easy application and dries to the touch within 2-4 hours
• Is moisture permeable and protects against water intrusion
• Long term savings 

Download PDF

Date: April, 2015
Location: Grove City, PA

Application
Trowel

Browse Images