Allegheny College Dorm

PROBLEM: Repair spalled concrete slab

SOLUTION: Apply Arisfor ToughDeck® to repair spalled slab

Overview

At Allegheny College Campus,  a well traveled concrete slab was showing large amounts of spalling. After pressure washing the surface, only 50% of the previous coating was still present. The slab is located directly above a storage room and because of the slabs deterioration, water was seeping through causing damage. Arisfor ToughDeck® was applied and completed with a broom finish. Representatives from Allegheny College mentioned how easy it was to work with and that it looks like a brand new slab was poured.

Advantages

• Save costs by avoiding demolition

• Extremely durable

• Superior quality and finish

Download PDF

 

Date: June 2016
Location: Meadville, PA